(1) Development of MAPS-based detector ladders for the BESIII inner tracker upgrade, Nucl. Instrum. Methods A 924 (2019), 287-292, 2019-01, 第 1 作者
(2) 基于波形采样的CEPC电磁量能器读出单元测试系统, A testing system of scintillator readout unit based on waveform sampling for CEPC ECAL, 核技术 2018, 41(1): 010402, 2018, 第 3 作者
(3) R&D of the CEPC scintillator-tungsten ECAL, Journal of Instrumentation, 2018, 13: C03024, 2018, 第 1 作者
(4) 基于阻性阳极读出方法的气体电子倍增器二维成像性能, Study of the two dimensional imaging performance for the gas electron multiplier using the resistive anode readout method, 物理学报, 2017, 66 (7):072902, 2017, 第 11 作者
(5) BESIII主漂移室内室升级MAPS芯片探针台测试系统设计, Probe Testing system of MAPS chips for the BESIII inner drift chamber upgrade, 核电子学与探测技术, 2017, 37(3): 225-230, 2017, 第 11 作者
(6) Two-dimensional imaging triple-GEM detector with resistive anode readout, Journal of Instrumentation, 2017, 12(10):P10008, 2017, 第 11 作者
(7) GEM探测器公共触发信号的优化研究, 核电子学与探测技术, 2016, 第 11 作者
(8) Aging effect in the BESIII drift chamber, Chinese Physics C, 2016, 第 1 作者
(9) Design and optimization of resistive anode for a two-dimensional imaging GEM detector, Chinese Physics C, 2016, 第 11 作者
(10) A cylindrical GEM detector with analog readout for the BESIII experiment, NIMA, 2016, 第 10 作者
(11) A new inner drift chamber for BESIII MDC, International Journal of Modern Physics: Conference Series, 2014, 第 1 作者
(12) Study of 2D interpolating readout for a micro-pattern gaseous detector, Chinese physics C, 2013, 第 1 作者
(13) The Reconstruction Algorithm Study of 2D Interpolating Resistive Readout Structure, Chinese Physics C, 2013, 第 2 作者
(14) Performance of the BESIII drift chamber, Nuclear Science Symposium Conference Record (NSS/MIC), 2009IEEE, 2009, 第 1 作者
(15) 北京谱仪Ⅲ电磁量能器晶体尺寸的测量, 核电子学与探测技术, 2009, 第 4 作者
(16) BESⅢ量能器总装中CsI(Tl)晶体探测单元的光脉冲检测, 核电子学与探测技术, 2009, 第 4 作者
(17) The Design and Assembly of the CsI(Tl) Crystal Module of the BESIII Electro-magnetic Calorimeter, Chinese Physics C , 2008, 第 1 作者
(1)BESIII detector and upgrade 2019-09-05
(2)Research Activities in ECOPICS 2019-04-24
(3)Scin-W ECAL R&D progress 2019-04-11
(4)Progress of the CEPC scintillator-tungsten ECAL 2019-01-23
(5)R&D Status of the CEPC ScW ECAL 2018-05-24
(6)R&D Status of the CEPC ECAL 2018-01-22
(7)Development of a MAPS detector prototype for the BESIII inner drift chamber upgrade 2017-12-10
(8)Progress of CEPC scintillator-tungsten structure ECAL 2017-10-02
(9)Status of the MDC and the new inner chamber 2016-06-13
(10)Integration of the new IT in the BESIII experiment 2015-11-16
(11)用于BESIII 内径迹室的圆筒GEM探测器的研制 2015-07-23
(12)The Status of BESIII 董明义 2008-07-29