(1) Preliminary design of a femtosecond timing system for large accelerator facilities, Nucl. Sci. Tech., 2018, 第 1 作者
(2) Precise magnetic field control of the scanning magnets for the APTRON beam delivery system, Nucl. Sci. Tech., 2017, 第 2 作者
(3) The front-end electronics design of dose monitors for beam delivery system of Shanghai Advanced Proton Therapy Facility, Nucl. Sci. Tech., 2017, 第 3 作者
(4) Implementation of SINAP Timing System in Shanghai Proton Therapy Project, Proc. of IPAC’2016, 2016, 第 3 作者
(5) 剂量电离室数字滤波器设计, 核电子学与探测技术, 2016, 第 3 作者
(6) A scheme design of collimator for gantry in proton therapy facility, Nuclear Instruments and Methods in Physics Research, A, 2015, 第 1 作者
(1)SINAP定时系统的研发与应用 第二届全国加速器束测控制技术研讨会 2017-11-16
(2)Development and implementation of the treatment control system in Shanghai Proton Therapy Facility 2017-10-12
(3)Design and prototyping of a new synchronization system with stability at femtoseconds 2017-10-10